Final works




We are leaving some spaces empty, because one tile motif has not arrived yet. And it is the most beautiful one.

 

big tiles have arrived.

making corner look right

cleaning tiles

cleaning the floor


moving septic tank


They made it in the middle of the garden before. This would mean we can not have a proper tree there.



But now it will be under parking space.


almost done.


Edges will have rounded stones to prevent mud going around.



The doors are from teak wood.


First they aligned to terrace, but it turns out, it is not parallel to fence.


Aligning to fence is the right solution. If not, it looked wrong.




Heavy rain came.


Almost done.


Electrician put wire outside... ugh... 


The lines are not straight. Why? Because stones are not same, but they wanted to keep 7cm distance. It looks wrong. Need to fix!


Because of tight schedule.


They work at night


And they made it straight. 


Looks much better.


Water heater needs to be there, eh well.. At least we will not wait for warm water


Tiles are straight now!


Doors are being installed



Toilet installed


The sink needs to be moved to the left, but it feels right in this space.


Door is from real wood and is adjusted on the spot


Tropical rain again


We bought door handle


How Sukham wanted to install the handle. eeemm... Nope


Nope


No


ok... better



a little left, a little right


yes!





We tried the paint. Here it is not dry yet.


It got a little brighter. 


It has a slight blue tint. We think it looks nice.


We got the most fancy one. UV protection, Water protection, flexible... We do not have much façade, so 2.5 kg is probably enough...






more pictures coming soon..








Comments

Popular posts from this blog

We bought a house!, Bali

Terrace roof

The Spirit Island

Bali flower tiles

Giant closet

Morning walk, Kuwum

Ubud vibes, Bali

Pura Luhur Bhujangga Waisnawa Gunung Sari

Terrace roof